Mmcp.market

Change Order MCP server

by theluckystrike·io.github.theluckystrike/change-order·v0.22.0

Change orders against a quote or work order: deltas, approval, running contract value.

A88/100grade A
What users say
No reviews yet
Be the first
Safety scan
A88/100

full report

Adoption
Growing

0 stars

Reviews

Write one

Nobody has reviewed Change Order yet.

If you have run it, two minutes of your experience saves the next person an afternoon.

Change Order tools (11, 8 write)

write = sends, deletes, buys or posts
  • change_order_add_linewrite actionFree

    Add one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.

  • change_order_createwrite actionFree

    Raise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.

  • change_order_deletewrite actionFree

    Delete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued.

  • change_order_documentwrite actionFree

    Render one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same text also comes back as a .txt download link valid for one hour. Pro.

  • change_order_getwrite actionFree

    Return one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id.

  • change_order_invoice_payloadwrite actionFree

    Build the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.

  • change_order_listwrite actionFree

    List change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date.

  • change_order_statuswrite actionFree

    Move one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.

  • contract_valueFree

    The running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.

  • license_activateFree

    Turn Pro on for this connection with key, an MCPL1.<payload>.<signature> issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it.

  • license_statusFree

    Report this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes.

Public scan report

scanner v0.1.5 · 2026-09-19 · same rubric, same numbers if you re-run it

no findings
  • Code scanpackage could not be scannedn/a
  • Live reliabilityremote reachable in 120ms20/20
  • Tool poisoning11 tool descriptions checked15/15
  • Auth qualityAPI key sent as a header8/15
  • Maintenancelast push 1 days ago15/15
  • Maintainer identityregistry namespace matches repository owner; GitHub account older than a year8/10
Overall 88/100. Components that don't apply are left out of the denominator. Any critical finding is an F.RubricAppeal a findingJSON

Grade history

  • 2026-09-19restoreCAscore 88

Install directly

claude mcp add --transport http change-order https://mcp.zovo.one/mcp/change-order
Add to Cursor

Change Order: common questions

Is Change Order MCP server safe?
Yes, by our scan: it is graded A (88/100). Read the Change Order safety report
How do I install Change Order?
It runs remotely at mcp.zovo.one. Add it to Claude Code, Claude Desktop or Cursor with the snippets above, or call it through the mcp.market gateway without installing anything.
Does Change Order need an API key?
Yes. The registry entry asks for MCP_LICENSE_KEY, Authorization.
Is Change Order maintained?
The last commit was in the last day (2026-09-19). The latest release is v0.22.0.
Is Change Order up?
100% of our last 2 checks got an answer. We check remote servers about four times a day.

Alternatives to Change Order

Same job from other publishers: the closest match first, then the best rated.

All Change Order alternatives →

More from theluckystrike